Case Studies

14” Remote Tecno Plug | NGL-4 Plant, Mesaieed Industrial City, Qatar

Written by Admin | Aug 16, 2021 3:17:21 PM

STATS Group were required to provide double block and bleed isolation on a 14” NGL pipeline as part of a scheduled plant shutdown, facilitating critical maintenance of an ESD valve. Qatar Petroleum approached STATS Group to assist with providing a safe isolation at their fourth Natural Gas Liquids Plant (NGL-4) in Mesaieed Industrial City, Qatar.