Case Studies

30" Dual BISEPs, Cortez Pipeline, New Mexico, USA

Written by Admin | Aug 16, 2021 3:34:49 PM

STATS Group were contracted by Kinder Morgan to provide a hot tap and plugging operation on a high pressure 30” Carbon Dioxide pipeline operating at 148 bar / 2,140 psi. This successful operation was the world’s first leak-tight double block and bleed isolation of a high pressure CO2 pipeline system.