Internal End Cap removed for Seal Cartridge and Temporary Anchor installation in gravity base structure 300m below sea level
STATS Group successfully executed a 36” pipeline tie-in for Equinor’s Troll Alpha Platform in 2011 which marked the completion of an 18 month design, manufacturing and installation project.
In this case study, we discuss the challenges and the custom-engineered solutions we developed for what, at the time, was one of STATS Group's most complex projects to date.