---
title: 36” Tethered Tecno Plug | BP Sullom Voe Terminal, Shetland
description: STATS Group has successfully completed an isolation project on TAQA’s Brent pipeline at Sullom Voe Terminal in the Shetland Islands.
---

[Case Studies ](https://www.statsgroup.com/resources/case-studies)

# [36” Tethered Tecno Plug | BP Sullom Voe Terminal, Shetland](https://www.statsgroup.com/resources/case-studies/36-tethered-tecno-plug-bp-sullom-voe-terminal-shetland)

 Written by [Admin](https://www.statsgroup.com/resources/case-studies/author/admin) | Aug 16, 2021 3:41:21 PM

STATS Group has successfully completed an isolation project on TAQA’s Brent pipeline at Sullom Voe Terminal in the Shetland Islands. BP required to undertake a valve refurbishment operation on the 36” Brent Pipeline Pig Receiver while the pipeline remained in normal operation.

[View full post](https://www.statsgroup.com/resources/case-studies/36-tethered-tecno-plug-bp-sullom-voe-terminal-shetland)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Admin"
  },
  "dateModified" : "2026-04-21T10:40:50.063Z",
  "datePublished" : "2021-08-16T15:41:21Z",
  "headline" : "36” Tethered Tecno Plug | BP Sullom Voe Terminal, Shetland",
  "image" : {
    "@type" : "ImageObject",
    "height" : 320,
    "url" : "https://www.statsgroup.com/hs-fs/hubfs/StatsGroup_August2020/images/2-2-w640h480.png?width=640&height=320&name=2-2-w640h480.png",
    "width" : 640
  },
  "mainEntityOfPage" : "https://www.statsgroup.com/resources/case-studies/36-tethered-tecno-plug-bp-sullom-voe-terminal-shetland",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```