Case Studies

Optimising Offshore: STATS' Pipe End Plugs for Pressurised Installation

Written by Admin | Aug 16, 2021 1:09:31 PM

Subsea 7 contracted STATS Group to provide positive isolation of pressurised mechanically lined BuBiĀ® pipe to facilitate reeling onto a pipe lay vessel at their facility in Norway, prior to installation at the Aasta Hansteen gas field.