14” 2500# Subsea Mechanical Connector, North Sea, UKCS

14” 2500# Subsea Mechanical Connector, North Sea, UKCS

STATS Group provided two class 2500 subsea mechanical connectors as part of a subsea flange repair project in the North Sea, UKCS.
Read the case study
6” BISEP with Integrated Bypass, Perth, Australia

6” BISEP with Integrated Bypass, Perth, Australia

Hot tapping and plugging on a 6” natural gas pipeline to safely re-route a pipeline to allow construction of a new highway, while production was maintained.
Read the case study
12” Remote Tecno Plug, Valve Changeout, Malaysia

12” Remote Tecno Plug, Valve Changeout, Malaysia

STATS Group was contracted on behalf of E&P O&M Services Sdn Bhd (EPOMS) to provide isolation and reinstatement leak-testing of a 12” shutdown valve on the Larut ...
Read the case study
24” Remote Tecno Plug, Pipeline Relocation, Canada

24” Remote Tecno Plug, Pipeline Relocation, Canada

STATS Group was recently contracted by a multinational pipeline company in Canada to provide leak-tight double block isolation of a 24” crude oil line that required to ...
Read the case study
30” Remote Tecno Plug, SIRGE Pipeline, Shetland Gas Plant, UK

30” Remote Tecno Plug, SIRGE Pipeline, Shetland Gas Plant, UK

STATS Group were contracted by Px Limited to carry out a double block isolation of the Shetland Island Regional Gas Export (SIRGE) pipeline approximately 500 metres ...
Read the case study
8

8" BISEP, Natural Gas Plant, Malaysia

STATS Group were recently retained by a major operator in Malaysia to provide hot tapping and isolation of a pressurised 8” pipeline at an onshore gas plant.
Read the case study
42

42" Dual BISEPs & Bypass, Fuel Gas Pipeline, Kuwait

STATS Group were contracted to provide hot tapping and plugging services on a 42” gas pipeline for a national oil company in Kuwait. In order to allow new fuel gas lines ...
Read the case study
DNV Approves STATS Group Pipeline Isolation Tools | Blog

DNV Approves STATS Group Pipeline Isolation Tools | Blog

STATS Group has received the DNV GL seal of approval for its Tecno Plug and BISEP range of pipeline isolation tools.
Read the case study
48

48" Remote Tecno Plug | Alberta, Canada

A major North American pipeline operator commissioned STATS Group to execute the isolation of one of their key export pipelines. Enbridge Pipelines Inc, (Enbridge) ...
Read the case study
40” Tethered Tecno Plug | Zeebrugge LNG Terminal, Belgium

40” Tethered Tecno Plug | Zeebrugge LNG Terminal, Belgium

STATS Group, has completed an isolation project on behalf of Interconnector UK Ltd to facilitate valve remedial works at the Zeebrugge Onshore Gas Terminal in Belgium.
Read the case study
BISEP, Steam Line Isolation Rehabilitation

BISEP, Steam Line Isolation Rehabilitation

STATS were contracted to provide leak-tight pipeline isolation services on three pressurised steam lines as part of a larger restoration project at a major refinery in ...
Read the case study
38” Remote Tecno Plugs & Leak Testing, Onshore Pipeline, Qatar

38” Remote Tecno Plugs & Leak Testing, Onshore Pipeline, Qatar

STATS Group was contracted by the largest LNG producer in the world to provide isolation and reinstatement leak-testing of a 38” sour gas export pipeline in Qatar. STATS ...
Read the case study

Get in touch

If you have a question or would like more information, we are here to help you!
Find out more

Terms & Conditions

Click on the links below to download a copy of our Terms and Conditions

Purchase Order Terms and Conditions

Terms and Conditions for Sale, Rental, and Services

For further information, please email: sales@statsgroup.com