STATS has successfully completed a challenging project involving a hot tap and line stop isolation on a 33bar operating system, allowing for the safe replacement of two 6" Slam Shut valves while maintaining uninterrupted gas supply at Beeston Above Ground Installation (AGI) near Nottingham.