Case Studies

8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

Written by Admin | Aug 16, 2021 1:30:42 PM

STATS Group was contracted by CUEL Ltd. in June 2016 to assist with the repair of an 8” gas condensate export pipeline, located in the Gulf of Thailand. The pipeline situated at a water depth of approximately 60m has an operating pressure ranging from between 7 and 21 bar. The pipeline had been dragged approximately 8m out of position by a vessel anchor and required a permanent repair.