Localised Weld Testing Streamlines Critical Valve Replacement in Australia
Tool - Weld Test Tool
Location - Australia

Operating Environment - Gas Plant
Pipeline Medium - Gas
Activity - Valve Repair / Replacement
36in Inline Weld Test Tool
STATS Group supplied two 36” Inline Weld Test Tools (IWTTs) for a valve replacement programme at a gas processing facility in Western Australia. Following installation of the replacement valve and weld-neck flanges, the tools were used to verify the upstream and downstream flange welds by performing a localised hydrostatic test on each weld at 213 bar.
Targeted Weld Testing Without the Full-System Hydrotest
Welded repairs and modifications must undergo leak or strength testing to confirm their integrity. Conventionally, this can require an entire piping spool or process system to be flooded and pressurised. On large-diameter, mature pipework, a full-system hydrotest can extend the shutdown, increase test-water volumes and expose equipment outside the immediate worksite to unnecessary pressure and potential leakage. The project therefore required a controlled method that would test only the newly completed welds.
During a planned shutdown, the 36” pipeline was vented and purged before the defective welded valve was cut out and removed. New flanges were then welded to the pipe ends, and an Inline Weld Test Tool was positioned across each new flange weld. The tool’s seals were hydraulically set, creating a compact test cavity that was filled with water and pressurised to 213 bar. This allowed each weld to be verified without subjecting the wider system to a full hydrotest. The robust seal arrangement also supports reliable performance where pipework is pitted or slightly oval.
36in Inline Weld Test Tool
Using Inline Weld Test Tools reduced the volume of test medium required, confined the elevated pressure to the new components and avoided unnecessary stress on mature process equipment. Their straightforward installation and activation also streamlined the work sequence, supporting an efficient turnaround without compromising safety or test assurance.
Ragesh Ravi
The tools were supplied with fully certified ancillary equipment and a workscope-specific technical procedure, supporting safe and efficient execution while minimising maintenance downtime.