3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK

3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK

TAQA Bratani Ltd required an isolation solution to facilitate pipework replacement of a 3” instrument air line on board the Tern Alpha Platform without the necessity for ...
Read the case study
5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada

5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada

STATS Group has developed a mini-version of its BI-STOP pipeline isolation tool to assist Alberta-based ATCO Gas to complete a meter replacement programme in built-up ...
Read the case study
Caisson Securing & Recovery, North Sea, UK

Caisson Securing & Recovery, North Sea, UK

As assets remain in service beyond their planned operational lifespan, caissons will inevitably experience severe external and internal corrosion due to their harsh ...
Read the case study
Riser Securing Clamps | AH001 Ivanhoe Oil Field

Riser Securing Clamps | AH001 Ivanhoe Oil Field

Background / Challenge North Sea Floating vessel had been decommissioned Requirement to release multiple flexible risers from the platform for abandonment Serviceability ...
Read the case study
24” Caisson Liner 95m Long | Piper Bravo, North Sea, UK

24” Caisson Liner 95m Long | Piper Bravo, North Sea, UK

Caisson Liner during factory acceptance testing and offshore installation
Read the case study
Subsea Mechanical Clamp and Hot Tap Tie-In

Subsea Mechanical Clamp and Hot Tap Tie-In

18"x12" Subsea Mechanical Clamp, Valve and SureTap Hot Tap Machine
Read the case study
High Integrity Sealing Plugs, Brazil

High Integrity Sealing Plugs, Brazil

STATS were approached by a multinational oilfield services company to design and manufacture high integrity, high-flow, ROV hot stab receptacle sealing plugs. In total, ...
Read the case study
10

10" Subsea Hot Tapping and Plugging, Gulf of Mexico

STATS Group was contracted to assist with the isolation and abandonment of a 10” oil pipeline in the Gulf of Mexico, at a water depth of approximately 25 meters. The ...
Read the case study
14” Subsea Pipeline Isolation & Repair, East China Sea

14” Subsea Pipeline Isolation & Repair, East China Sea

Following on from the success of significant subsea pipeline isolation and repair projects completed for the 28” Yacheng Pipeline in China and 8” subsea pipeline in the ...
Read the case study
8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

STATS Group was contracted by CUEL Ltd. in June 2016 to assist with the repair of an 8” gas condensate export pipeline, located in the Gulf of Thailand. The pipeline ...
Read the case study
42” Subsea Abandonment Plug, Dubai, UAE

42” Subsea Abandonment Plug, Dubai, UAE

STATS Group were approached by a national oil company in the middle east which had a requirement to isolate a 42” subsea pipeline dead leg housed within an oil storage ...
Read the case study
28

28" Subsea Pipeline Isolation & Repair, Yacheng Pipeline, China

STATS Group were contracted by COOEC Subsea Technology Co Ltd to provide temporary subsea isolation of the Yacheng pipeline, situated in the South China Sea. The 780 ...
Read the case study

Contact Us

We offer expertise and cutting-edge technologies to solve your integrity challenges.
Enquire Now

Terms & Conditions

Click on the links below to download a copy of our Terms and Conditions

Purchase Order Terms and Conditions

Terms and Conditions for Sale, Rental, and Services

For further information, please email: sales@statsgroup.com