14” 2500# Subsea Mechanical Connector, North Sea, UKCS

14” 2500# Subsea Mechanical Connector, North Sea, UKCS

STATS Group provided two class 2500 subsea mechanical connectors as part of a subsea flange repair project in the North Sea, UKCS.
Read the case study
Subsea Mechanical Clamp and Hot Tap Tie-In

Subsea Mechanical Clamp and Hot Tap Tie-In

18"x12" Subsea Mechanical Clamp, Valve and SureTap Hot Tap Machine
Read the case study
High Integrity Sealing Plugs, Brazil

High Integrity Sealing Plugs, Brazil

STATS were approached by a multinational oilfield services company to design and manufacture high integrity, high-flow, ROV hot stab receptacle sealing plugs. In total, ...
Read the case study
10

10" Subsea Hot Tapping and Plugging, Gulf of Mexico

STATS Group was contracted to assist with the isolation and abandonment of a 10” oil pipeline in the Gulf of Mexico, at a water depth of approximately 25 meters. The ...
Read the case study
14” Subsea Pipeline Isolation & Repair, East China Sea

14” Subsea Pipeline Isolation & Repair, East China Sea

Following on from the success of significant subsea pipeline isolation and repair projects completed for the 28” Yacheng Pipeline in China and 8” subsea pipeline in the ...
Read the case study
8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

STATS Group was contracted by CUEL Ltd. in June 2016 to assist with the repair of an 8” gas condensate export pipeline, located in the Gulf of Thailand. The pipeline ...
Read the case study
42” Subsea Abandonment Plug, Dubai, UAE

42” Subsea Abandonment Plug, Dubai, UAE

STATS Group were approached by a national oil company in the middle east which had a requirement to isolate a 42” subsea pipeline dead leg housed within an oil storage ...
Read the case study
28

28" Subsea Pipeline Isolation & Repair, Yacheng Pipeline, China

STATS Group were contracted by COOEC Subsea Technology Co Ltd to provide temporary subsea isolation of the Yacheng pipeline, situated in the South China Sea. The 780 ...
Read the case study
20” Tethered Tecno Plug | North West Hutton Decommissioning

20” Tethered Tecno Plug | North West Hutton Decommissioning

As part of the North West Hutton decommissioning programme, STATS Group were contracted to supply a high pressure pipeline isolation plug to provide a double block and ...
Read the case study
Isolation EPRS, North Field, Qatar

Isolation EPRS, North Field, Qatar

Remote Tecno Plugs™, subsea monitoring and communication systems
Read the case study
Isolation EPRS, Qatargas, North Field, Qatar

Isolation EPRS, Qatargas, North Field, Qatar

32” and 38” Remote Tecno Plugs with pigging bypass technology
Read the case study
36” Pipeline Pull-In | Troll Alpha, North Sea, Norway

36” Pipeline Pull-In | Troll Alpha, North Sea, Norway

Internal End Cap removed for Seal Cartridge and Temporary Anchor installation in gravity base structure 300m below sea level
Read the case study

Contact Us

We offer expertise and cutting-edge technologies to solve your integrity challenges.
Enquire Now

Terms & Conditions

Click on the links below to download a copy of our Terms and Conditions

Purchase Order Terms and Conditions

Terms and Conditions for Sale, Rental, and Services

For further information, please email: sales@statsgroup.com