36” Remote Tecno Plug | Dol 2 Platform, North Field, Qatar
Situated off the north-east coast of Qatar, lies the largest single gas field in the world – the North Field. Dolphin Energy has installed two Offshore Production ...
Read the case study

36” Remote Tecno Plugs | Mlng-dua, Bintulu, East Malaysia
The Petronas LNG Complex in Bintulu, Sarawak comprises three LNG plants owned and operated by Petronas’ joint venture companies. This complex is one of the world’s ...
Read the case study

36” Remote Tecno Plug, Main Oil Trunkline, Arabian Peninsula
STATS Group were recently retained by a major operator in the Arabian Peninsula to provide pressurised isolation of a 36” trunkline in the first piggable isolation of ...
Read the case study

30" Dual BISEPs, Cortez Pipeline, New Mexico, USA
STATS Group were contracted by Kinder Morgan to provide a hot tap and plugging operation on a high pressure 30” Carbon Dioxide pipeline operating at 148 bar / 2,140 psi. ...
Read the case study

24” Remote Tecno Plug, Onshore Receiving Facility, Malaysia
STATS Group has successfully carried out a double block isolation of two 24” gas pipelines at an Onshore Receiving Facility in the Malaysian state of Sarawak.
Read the case study

24" Remote Tecno Plug, Gulf of Thailand
STATS Group has successfully carried out a double block isolation of a 24” gas pipeline operating at a pressure of 121 bar in the Gulf of Thailand.
Read the case study

24" Remote Tecno Plug, Gas Export Pipeline, Qatar
STATS Group was contracted by a multinational oil and gas operator in Qatar to provide the isolation of a 120 km, 24” gas export pipeline operating at a pressure of 45 ...
Read the case study

24” Remote Tecno Plug | Dunlin Alpha Platform, North Sea, UK
Fairfield Energy Ltd had a requirement to replace the two launcher valves on the 24” oil export line from Dunlin Alpha to Cormorant Alpha. In order to undertake this ...
Read the case study

24” Remote Tecno Plug | Doha, Qatar
STATS Group were recently retained by a major oil producer in Qatar to provide fast-track delivery of a high pressure isolation tool to facilitate safe and reliable ...
Read the case study

24” Remote Tecno Plug | Marnock ETAP Spur Line, Central North Sea, UK
STATS Group has successfully isolated a 24” oil export line on BP’s Marnock Eastern Trough Area Project spur line located in the Central North Sea to allow the ...
Read the case study

20” Tethered Tecno Plug | North Everest Platform, North Sea, UK
STATS were approached by AMEC to propose an isolation solution to allow maintenance and replacement works on three maintenance valves and one ESD valve on a 20” gas ...
Read the case study

18" Tethered Tecno Plug, Offshore Platform, Australia
STATS Group has successfully carried out inline isolation services to allow the replacement of an 18” bypass valve on an offshore platform in Australia’s Bass Strait. ...
Read the case study