18” BISEP & 32” Tecno Plug | OSC, Terengganu, East Malaysia
The successful deployment of STATS Group’s BISEP isolation technology prevented the costly shutdown of a Malaysian pipeline and allowed it to maintain uninterrupted gas ...
Read the case study

16" Bisep, Solar Power Station, Abu Dhabi, Uae
A solar power station in Abu Dhabi, one of the largest of its kind in the world, was the latest location for the deployment of STATS hot tap installed pipeline plugging ...
Read the case study

14” Remote Tecno Plug | NGL-4 Plant, Mesaieed Industrial City, Qatar
STATS Group were required to provide double block and bleed isolation on a 14” NGL pipeline as part of a scheduled plant shutdown, facilitating critical maintenance of ...
Read the case study

14” BISEP | Galeota Point Terminal Facility, Trinidad
BP Trinidad and Tobago approached STATS to hot tap and insert a Double Block and Bleed isolation Plug in two 14” crude oil pipelines, located in the Galeota Point ...
Read the case study

12” Remote Tecno Plug | Onshore Production Station, New Zealand
STATS Group were contracted by OSD Pty Limited on behalf of a national energy company to provide double block and bleed isolation of a 12” gas pipeline while at an ...
Read the case study

10" Bisep, Natural Gas Plant, Australia
STATS Group were recently retained by a major operator in Australia to provide isolation of a pressurised 10” LPG pipeline at a natural gas plant. The isolation was ...
Read the case study

10” Dual BISEPs | Jet Fuel Pipeline, Abu Dhabi, UAE
STATS Group were contracted by Bilfinger Deutsche Babcock on behalf of the Abu Dhabi Oil Refining Company, Takreer, to provide hot tapping and plugging services to allow ...
Read the case study

10” BISEP | Brent Bravo & Delta Platforms, North Sea, UK
Innovative, ground breaking and even, on occasion, not possible, just a few of the references to the successfully completed Brent Bravo and Brent Delta Cell Fill Line ...
Read the case study

6” Bisep™ | Theddlethorpe Terminal, Lincolnshire, Uk
STATS Group, has completed a pipeline isolation project at Theddlethorpe gas terminal in Lincolnshire on behalf of Wood Group PSN and Conoco Phillips. STATS technicians ...
Read the case study

6” BISEP™ | Dammam’s Second Industrial Area, Saudi Arabia
STATS Group performed hot tapping and plugging operations on a live gas pipeline to allow maintenance activities to be carried out safely in the Kingdom of Saudi Arabia.
Read the case study

4" BISEP & Tecno Plug, Gas Plant, Abu Dhabi, UAE
STATS Group were required to provide a double block and bleed isolation as an emergency response for a major gas processing plant in Abu Dhabi, UAE. The quick response ...
Read the case study

3.5" BISEP™ | Murchison Platform, North Sea, UK
STATS Group in collaboration with Paradigm Flow Services and Halliburton safely and successfully isolated, de-oiled, plugged and abandoned two 3.5” subsea flowlines as ...
Read the case study