
24” Remote Tecno Plug | Marnock ETAP Spur Line, Central North Sea, UK
STATS Group has successfully isolated a 24” oil export line on BP’s Marnock Eastern Trough Area Project spur line located in the Central North Sea to allow the ...
Read the case study

20” Tethered Tecno Plug | North Everest Platform, North Sea, UK
STATS were approached by AMEC to propose an isolation solution to allow maintenance and replacement works on three maintenance valves and one ESD valve on a 20” gas ...
Read the case study

Inline Isolation, 18-inch Bypass Valve Replacement Offshore Australia
STATS Group has successfully carried out inline isolation services to allow the replacement of an 18” bypass valve on an offshore platform in Australia’s Bass Strait. ...
Read the case study

18” BISEP & 32” Tecno Plug | OSC, Terengganu, East Malaysia
The successful deployment of STATS Group’s BISEP isolation technology prevented the costly shutdown of a Malaysian pipeline and allowed it to maintain uninterrupted gas ...
Read the case study

16" Bisep, Solar Power Station, Abu Dhabi, Uae
A solar power station in Abu Dhabi, one of the largest of its kind in the world, was the location for the deployment of STATS hot tap installed line stop technology. ...
Read the case study

14” Remote Tecno Plug | NGL-4 Plant, Mesaieed Industrial City, Qatar
STATS Group were required to provide double block and bleed isolation on a 14” NGL pipeline as part of a scheduled plant shutdown, facilitating critical maintenance of ...
Read the case study

14” BISEP | Galeota Point Terminal Facility, Trinidad
BP Trinidad and Tobago approached STATS to hot tap and insert a Double Block and Bleed isolation Plug in two 14” crude oil pipelines, located in the Galeota Point ...
Read the case study

12” Remote Tecno Plug | Onshore Production Station, New Zealand
STATS Group were contracted by OSD Pty Limited on behalf of a national energy company to provide double block and bleed isolation of a 12” gas pipeline while at an ...
Read the case study

10" Bisep, Natural Gas Plant, Australia
STATS Group were recently retained by a major operator in Australia to provide isolation of a pressurised 10” LPG pipeline at a natural gas plant. The isolation was ...
Read the case study

10” Dual BISEPs | Jet Fuel Pipeline, Abu Dhabi, UAE
STATS Group were contracted by Bilfinger Deutsche Babcock on behalf of the Abu Dhabi Oil Refining Company, Takreer, to provide hot tapping and plugging services to allow ...
Read the case study

10” BISEP | Brent Bravo & Delta Platforms, North Sea, UK
Innovative, ground breaking and even, on occasion, not possible, just a few of the references to the successfully completed Brent Bravo and Brent Delta Cell Fill Line ...
Read the case study

6” Bisep™ | Theddlethorpe Terminal, Lincolnshire, Uk
STATS Group, has completed a pipeline isolation project at Theddlethorpe gas terminal in Lincolnshire on behalf of Wood Group PSN and Conoco Phillips. STATS technicians ...
Read the case study