6” BISEP™ | Dammam’s Second Industrial Area, Saudi Arabia
STATS Group performed hot tapping and plugging operations on a live gas pipeline to allow maintenance activities to be carried out safely in the Kingdom of Saudi Arabia.
Read the case study

4" BISEP & Tecno Plug, Gas Plant, Abu Dhabi, UAE
STATS Group were required to provide a double block and bleed isolation as an emergency response for a major gas processing plant in Abu Dhabi, UAE. The quick response ...
Read the case study

3.5" BISEP™ | Murchison Platform, North Sea, UK
STATS Group in collaboration with Paradigm Flow Services and Halliburton safely and successfully isolated, de-oiled, plugged and abandoned two 3.5” subsea flowlines as ...
Read the case study

3” BISEP™ | Piper Bravo Platform, North Sea, UK
Wood Group on behalf of Talisman Energy UK, required an isolation to be conducted on a 3” Air Line on-board the Piper Bravo. The isolation would facilitate a deconstruct ...
Read the case study

3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK
TAQA Bratani Ltd required an isolation solution to facilitate pipework replacement of a 3” instrument air line on board the Tern Alpha Platform without the necessity for ...
Read the case study

5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada
STATS Group has developed a mini-version of its BI-STOP pipeline isolation tool to assist Alberta-based ATCO Gas to complete a meter replacement programme in built-up ...
Read the case study

Caisson Securing & Recovery, North Sea, UK
As assets remain in service beyond their planned operational lifespan, caissons will inevitably experience severe external and internal corrosion due to their harsh ...
Read the case study

Riser Securing Clamps | AH001 Ivanhoe Oil Field
Background / Challenge North Sea Floating vessel had been decommissioned Requirement to release multiple flexible risers from the platform for abandonment Serviceability ...
Read the case study

24” Caisson Liner 95m Long | Piper Bravo, North Sea, UK
Caisson Liner during factory acceptance testing and offshore installation
Read the case study

Subsea Mechanical Clamp and Hot Tap Tie-In
STATS were contracted by a global engineering and construction company to provide subsea mechanical clamp and hot tapping services in the Bass Strait, offshore ...
Read the case study

High Integrity Sealing Plugs, Brazil
STATS were approached by a multinational oilfield services company to design and manufacture high integrity, high-flow, ROV hot stab receptacle sealing plugs. In total, ...
Read the case study

10" Subsea Hot Tapping and Plugging, Gulf of Mexico
STATS Group was contracted to assist with the isolation and abandonment of a 10” oil pipeline in the Gulf of Mexico, at a water depth of approximately 25 meters. The ...
Read the case study