14” Subsea Pipeline Isolation & Repair, East China Sea

14” Subsea Pipeline Isolation & Repair, East China Sea

Following on from the success of significant subsea pipeline isolation and repair projects completed for the 28” Yacheng Pipeline in China and 8” subsea pipeline in the ...
Read the case study
8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

8” Subsea Pipeline Isolation & Repair, Gulf of Thailand

STATS Group was engaged by CUEL Ltd to address physical damage to a specific section of an 8” gas condensate export pipeline in the Gulf of Thailand. This damage was ...
Read the case study
42” Subsea Abandonment Plug, Dubai, UAE

42” Subsea Abandonment Plug, Dubai, UAE

STATS Group were approached by a national oil company in the middle east which had a requirement to isolate a 42” subsea pipeline dead leg housed within an oil storage ...
Read the case study
28

28" Subsea Pipeline Isolation & Repair, Yacheng Pipeline, China

STATS Group were contracted by COOEC Subsea Technology Co Ltd to provide temporary subsea isolation of the Yacheng pipeline, situated in the South China Sea. The 780 ...
Read the case study
20” Tethered Tecno Plug | North West Hutton Decommissioning

20” Tethered Tecno Plug | North West Hutton Decommissioning

As part of the North West Hutton decommissioning programme, STATS Group were contracted to supply a high pressure pipeline isolation plug to provide a double block and ...
Read the case study
36” remote tecno plug | forties pipeline system, north sea, uk

36” remote tecno plug | forties pipeline system, north sea, uk

STATS Group were contracted by Apache North Sea Ltd to safely isolate the Forties Pipeline System (FPS) so that subsea isolation valves (SSIV) and piping spools could be ...
Read the case study
Isolation EPRS, North Field, Qatar

Isolation EPRS, North Field, Qatar

Remote Tecno Plugs™, subsea monitoring and communication systems
Read the case study
Isolation EPRS, Qatargas, North Field, Qatar

Isolation EPRS, Qatargas, North Field, Qatar

32” and 38” Remote Tecno Plugs with pigging bypass technology
Read the case study
36” Pipeline Pull-In | Troll Alpha, North Sea, Norway

36” Pipeline Pull-In | Troll Alpha, North Sea, Norway

Internal End Cap removed for Seal Cartridge and Temporary Anchor installation in gravity base structure 300m below sea level STATS Group successfully executed a 36” ...
Read the case study
24” Remote Tecno Plug | North Sea, UK

24” Remote Tecno Plug | North Sea, UK

Double block and bleed isolation barrier provides safe tie-in of replacement pipeline section
Read the case study
16

16" Remote Tecno Plug | K5-A Platform | Case Study

Tecno Plug™ isolates gas export pipeline to facilitate subsea metrology spool piece installation
Read the case study
Mechanical Pipe Connectors, Oil Terminal, Norway

Mechanical Pipe Connectors, Oil Terminal, Norway

STATS mechanical pipe Connectors provide a cold-work solution, removing the associated risks of welding. Quick and efficient to install, this permanent solution ...
Read the case study

Contact Us

We offer expertise and cutting-edge technologies to solve your integrity challenges.
Enquire Now

Terms & Conditions

Click on the links below to download a copy of our Terms and Conditions

Purchase Order Terms and Conditions

Terms and Conditions for Sale, Rental, and Services

For further information, please email: sales@statsgroup.com