More Filters
Tool
Location
Operating Environment
Pipeline Medium
Pipeline Activity
36" BISEP with Integrated bypass enables pipeline compliance without disrupting gas supply
As urban expansion brings growing populations closer to historically remote pipeline corridors, legacy infrastructure must be reassessed, not only to maintain ...
Engineering Excellence: How STATS Enabled OQGN's Critical Pipeline Tie-In, Oman
The Sultanate of Oman boasts an extensive oil and gas pipeline infrastructure, this network forms the backbone of the nation’s energy sector, driving economic growth and ...
STATS Group Delivers Landmark First Hot Tap & BISEP Isolation Project in Indonesia
STATS Group has successfully completed its first ever hot tap and BISEP® isolation project in Indonesia to support PEGASOL on behalf of Pertamina Gas Negara (PGN).
Executing Critical Valve Replacement on a 56” Pig Trap Receiver Without Halting Production, Saudi Arabia
STATS Group has successfully completed a 56” inline isolation of a crude oil pipeline in Saudi Arabia to enable a pig trap valve replacement without halting production.
Production Maintained During Challenging Valve Replacement, UK
STATS has successfully completed a challenging project involving a hot tap and line stop isolation on a 33bar operating system, allowing for the safe replacement of two ...
In-Line Weld Test Tool reduces costs and saves time by providing localised hydrostatic testing of externally welded thrust rings
STATS In-Line Weld Test Tool reduces costs and saves time by providing localised hydrostatic testing of externally welded thrust rings.
Delivering Safe In-Line Isolation for Critical Valve Replacement, North Sea
STATS Group proudly supported a multi-party operation delivering high-integrity pipeline isolation services on a North Sea gas pipeline, ensuring safe access for an ...
Super Duplex High Pressure 8" Structural Repair Clamps, North Sea
STATS has successfully designed a bespoke engineered solution for a valued client to be installed offshore in the North Sea.
48" BISEP, Precision Pipeline Intervention, Gas Segregation, Oman
STATS Group was contracted to perform hot tapping and line stopping operations for OQ Gas Networks (OQGN) on their 48” gas pipeline in Sur, Sultanate of Oman. Live ...
Long Distance Deployment of 30" In-Line Weld Test Tool, Scotland
STATS Group has successfully completed the long-distance deployment of a 30" In-Line Weld Test Tool at a gas processing terminal in Scotland.
6" to 36" Extended Body Weld Test Tools, France
Patriot International approached STATS Group to provide a range of modified weld test tools from 6" to 36" for an extended period for a pipeline construction project in ...
4" Hot Tap And Line Stop Project For Oil Flowline Recommissioning Project
A challenging remote location at high altitude in the southern highland mountains of Papua New Guinea was the destination for STATS Group’s 4” Hot Tap and Line Stop ...
20” Tethered Tecno Plug, Main Oil Line Nahada to Mina Al Fahal, Oman
Petroleum Development Oman (PDO) had a requirement to remove 14 bends from 20” bypass pipework around block valves on their main oil pipeline while the line remained ...
Mechanical Connectors Aid Rehabilitation of drain systems offshore
24" Mechanical Connector for installation in Norwegian North Sea
20” Remote Tecno Plug, Offshore Platform, South China Sea
STATS Group has successfully carried out a double block isolation of a 20” gas pipeline operating at 125 bar in the South China Sea. This is the first time a piggable ...
30” and 36” Hot Tapping and BISEP Isolation, USA
As the oil and gas industry transitions to a low carbon future the use of innovative technology to reduce emissions and ensure efficiency during maintenance and upgrade ...
20” Remote Tecno Plug, Offshore Platform, Bass Strait, Australia
STATS Group provided pipeline isolation services on an offshore platform to allow the safe replacement of a launcher valve, in the Bass Strait, off the coast of ...
Pig Launch Tray Recovery Tool, Pressurised Pipeline, Onshore Terminal
Following the successful completion of an offshore pipeline isolation project, STATS were asked by the client if they could offer a solution to an existing problem of an ...
14” 2500# Subsea Mechanical Connector, North Sea, UKCS
STATS Group provided two class 2500 subsea mechanical connectors as part of a subsea flange repair project in the North Sea, UKCS.
6” BISEP with Integrated Bypass, Perth, Australia
Hot tapping and plugging on a 6” natural gas pipeline to safely re-route a pipeline to allow construction of a new highway, while production was maintained.
12” Remote Tecno Plug, Valve Changeout, Malaysia
STATS Group was contracted on behalf of E&P O&M Services Sdn Bhd (EPOMS) to provide isolation and reinstatement leak-testing of a 12” shutdown valve on the Larut ...
24” Remote Tecno Plug, Pipeline Relocation, Canada
STATS Group was recently contracted by a multinational pipeline company in Canada to provide leak-tight double block isolation of a 24” crude oil line that required to ...
30” Remote Tecno Plug, SIRGE Pipeline, Shetland Gas Plant, UK
STATS Group were contracted by Px Limited to carry out a double block isolation of the Shetland Island Regional Gas Export (SIRGE) pipeline approximately 500 metres ...
8" BISEP, Natural Gas Plant, Malaysia
STATS Group were retained by a major operator in Malaysia to provide hot tapping and isolation of a pressurised 8” pipeline at an onshore gas plant.
42" Dual BISEPs & Bypass, Fuel Gas Pipeline, Kuwait
STATS Group were contracted to provide hot tapping and plugging services on a 42” gas pipeline for a national oil company in Kuwait.
DNV Approves STATS Group Pipeline Isolation Tools | Blog
STATS Group has received the DNV GL seal of approval for its Tecno Plug and BISEP range of pipeline isolation tools.
48" Remote Tecno Plug Isolation, Valve Repair, Crude Oil Pipeline, Canada
In 2016, a major North American pipeline operator commissioned STATS Group to execute the isolation of one of their key export pipelines. Enbridge Pipelines Inc, ...
40” Tethered Tecno Plug | Zeebrugge LNG Terminal, Belgium
STATS Group, has completed an isolation project on behalf of Interconnector UK Ltd to facilitate valve remedial works at the Zeebrugge Onshore Gas Terminal in Belgium.
BISEP, High Temperature Steam Line Isolation Rehabilitation
STATS were contracted to provide leak-tight pipeline isolation services on three pressurised steam lines as part of a larger restoration project at a major refinery in ...
38” Remote Tecno Plugs & Leak Testing, Onshore Pipeline, Qatar
STATS Group was contracted by the largest LNG producer in the world to provide isolation and reinstatement leak-testing of a 38” sour gas export pipeline in Qatar.
38” Remote Tecno Plug | Ras Laffan Facility, Doha, Qatar
STATS were required to isolate a 38” gas pipeline using a Remote Tecno Plug to facilitate the removal of a corroded 2” bypass branch connected to a 38” Emergency Shut ...
36” Remote Tecno Plug, Cormorant Alpha Platform, North Sea, UK
TAQA had a requirement to isolate a 36” crude oil pipeline on the Cormorant Alpha platform; the export line to Sullom Voe Terminal (SVT) in the Shetland Isles off north ...
36” Tethered Tecno Plug | BP Sullom Voe Terminal, Shetland
STATS Group has successfully completed an isolation project on TAQA’s Brent pipeline at Sullom Voe Terminal in the Shetland Islands. BP required to undertake a valve ...
36” Remote Tecno Plug | Dol 2 Platform, North Field, Qatar
Situated off the north-east coast of Qatar, lies the largest single gas field in the world – the North Field. Dolphin Energy has installed two Offshore Production ...
Remote Tecno Plug Pipeline Isolation at MLNG Dua, Bintulu, Malaysia
The Petronas LNG Complex in Bintulu, Sarawak comprises three LNG plants owned and operated by Petronas’ joint venture companies. This complex is one of the world’s ...
36” Remote Tecno Plug, Main Oil Trunkline, Arabian Peninsula
STATS Group were recently retained by a major operator in the Arabian Peninsula to provide pressurised isolation of a 36” trunkline in the first piggable isolation of ...
30" Dual BISEPs, Cortez Pipeline, New Mexico, USA
STATS Group were contracted by Kinder Morgan to provide hot tapping and line-stopping services on the 30-inch system. The successful completion of that work established ...
24” Remote Tecno Plug, Onshore Receiving Facility, Malaysia
STATS Group has successfully carried out a double block isolation of two 24” gas pipelines at an Onshore Receiving Facility in the Malaysian state of Sarawak.
24" Remote Tecno Plug, Gulf of Thailand
STATS Group has successfully carried out a double block isolation of a 24” gas pipeline operating at a pressure of 121 bar in the Gulf of Thailand.
24" Remote Tecno Plug, Gas Export Pipeline, Qatar
STATS Group was contracted by a multinational oil and gas operator in Qatar to provide the isolation of a 120 km, 24” gas export pipeline operating at a pressure of 45 ...
24" Remote Tecno Plug, Dunlin Alpha Platform, North Sea, UK
Fairfield Energy Ltd had a requirement to replace the two launcher valves on the 24” oil export line from Dunlin Alpha to Cormorant Alpha. In order to undertake this ...
24” Remote Tecno Plug | Doha, Qatar
STATS Group were recently retained by a major oil producer in Qatar to provide fast-track delivery of a high pressure isolation tool to facilitate safe and reliable ...
24” Remote Tecno Plug | Marnock ETAP Spur Line, Central North Sea, UK
STATS Group has successfully isolated a 24” oil export line on BP’s Marnock Eastern Trough Area Project spur line located in the Central North Sea to allow the ...
20” Tethered Tecno Plug | North Everest Platform, North Sea, UK
STATS were approached by AMEC to propose an isolation solution to allow maintenance and replacement works on three maintenance valves and one ESD valve on a 20” gas ...
Inline Isolation, 18-inch Bypass Valve Replacement Offshore Australia
STATS Group has successfully carried out inline isolation services to allow the replacement of an 18” bypass valve on an offshore platform in Australia’s Bass Strait. ...
18” BISEP & 32” Tecno Plug | OSC, Terengganu, East Malaysia
The successful deployment of STATS Group’s BISEP isolation technology prevented the costly shutdown of a Malaysian pipeline and allowed it to maintain uninterrupted gas ...
16" Bisep, Solar Power Station, Abu Dhabi, Uae
A solar power station in Abu Dhabi, one of the largest of its kind in the world, was the location for the deployment of STATS hot tap installed line stop technology. ...
14" Remote Tecno Plug, NGL-4 Plant, Mesaieed Industrial City, Qatar
STATS Group were required to provide double block and bleed isolation on a 14” NGL pipeline as part of a scheduled plant shutdown, facilitating critical maintenance of ...
14” BISEP | Galeota Point Terminal Facility, Trinidad
BP Trinidad and Tobago approached STATS to hot tap and insert a Double Block and Bleed isolation Plug in two 14” crude oil pipelines, located in the Galeota Point ...
12” Remote Tecno Plug | Onshore Production Station, New Zealand
STATS Group were contracted by OSD Pty Limited on behalf of a national energy company to provide double block and bleed isolation of a 12” gas pipeline while at an ...
10" Bisep, Natural Gas Plant, Australia
STATS Group were recently retained by a major operator in Australia to provide isolation of a pressurised 10” LPG pipeline at a natural gas plant. The isolation was ...
10” Dual BISEPs | Jet Fuel Pipeline, Abu Dhabi, UAE
STATS Group were contracted by Bilfinger Deutsche Babcock on behalf of the Abu Dhabi Oil Refining Company, Takreer, to provide hot tapping and plugging services to allow ...
10” BISEP | Brent Bravo & Delta Platforms, North Sea, UK
Innovative, ground breaking and even, on occasion, not possible, just a few of the references to the successfully completed Brent Bravo and Brent Delta Cell Fill Line ...
6” BISEP | Theddlethorpe Terminal, Lincolnshire, Uk
STATS Group, has completed a pipeline isolation project at Theddlethorpe gas terminal in Lincolnshire on behalf of Wood Group PSN and Conoco Phillips. STATS technicians ...
6” BISEP™ | Dammam’s Second Industrial Area, Saudi Arabia
STATS Group performed hot tapping and plugging operations on a live gas pipeline to allow maintenance activities to be carried out safely in the Kingdom of Saudi Arabia.
4" BISEP & Tecno Plug, Gas Plant, Abu Dhabi, UAE
STATS Group were required to provide a double block and bleed isolation as an emergency response for a major gas processing plant in Abu Dhabi, UAE. The quick response ...
3.5" BISEP™ | Murchison Platform, North Sea, UK
STATS Group in collaboration with Paradigm Flow Services and Halliburton safely and successfully isolated, de-oiled, plugged and abandoned two 3.5” subsea flowlines as ...
3” BISEP™ | Piper Bravo Platform, North Sea, UK
Wood Group on behalf of Talisman Energy UK, required an isolation to be conducted on a 3” Air Line on-board the Piper Bravo. The isolation would facilitate a deconstruct ...
3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK
TAQA Bratani Ltd required an isolation solution to facilitate pipework replacement of a 3” instrument air line on board the Tern Alpha Platform without the necessity for ...
5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada
STATS Group has developed a mini-version of its BI-STOP pipeline isolation tool to assist Alberta-based ATCO Gas to complete a meter replacement programme in built-up ...
Caisson Securing & Recovery, North Sea, UK
Offshore caissons were built to last decades. But as platforms remain in service beyond their original design life, those decades become a liability. Corrosion, fatigue ...
Riser Securing Clamps | AH001 Ivanhoe Oil Field
24” Caisson Liner 95m Long | Piper Bravo, North Sea, UK
Caisson Liner during factory acceptance testing and offshore installation
Subsea Mechanical Clamp and Hot Tap Tie-In, Bass Strait, Australia
STATS were contracted by a global engineering and construction company to provide subsea mechanical clamp and hot tapping services in the Bass Strait, offshore ...
High Integrity Sealing Plugs, Brazil
STATS were approached by a multinational oilfield services company to design and manufacture high integrity, high-flow, ROV hot stab receptacle sealing plugs. In total, ...
10" Subsea Hot Tapping and Plugging, Gulf of Mexico
STATS Group was contracted to assist with the isolation and abandonment of a 10” oil pipeline in the Gulf of Mexico, at a water depth of approximately 25 meters. The ...
14” Subsea Pipeline Isolation & Repair, East China Sea
Following on from the success of significant subsea pipeline isolation and repair projects completed for the 28” Yacheng Pipeline in China and 8” subsea pipeline in the ...
8” Subsea Pipeline Isolation & Repair, Gulf of Thailand
STATS Group was engaged by CUEL Ltd to address physical damage to a specific section of an 8” gas condensate export pipeline in the Gulf of Thailand. This damage was ...
42” Subsea Abandonment Plug, Dubai, UAE
STATS Group were approached by a national oil company in the middle east which had a requirement to isolate a 42” subsea pipeline dead leg housed within an oil storage ...
28" Subsea Pipeline Isolation & Repair, Yacheng Pipeline, China
STATS Group were contracted by COOEC Subsea Technology Co Ltd to provide temporary subsea isolation of the Yacheng pipeline, situated in the South China Sea. The 780 ...
20” Tethered Tecno Plug | North West Hutton Decommissioning
As part of the North West Hutton decommissioning programme, STATS Group were contracted to supply a high pressure pipeline isolation plug to provide a double block and ...
36” remote tecno plug | forties pipeline system, north sea, uk
STATS Group were contracted by Apache North Sea Ltd to safely isolate the Forties Pipeline System (FPS) so that subsea isolation valves (SSIV) and piping spools could be ...
Isolation EPRS, North Field, Qatar
Remote Tecno Plugs™, subsea monitoring and communication systems
Isolation EPRS, Qatargas, North Field, Qatar
32” and 38” Remote Tecno Plugs with pigging bypass technology
36” Pipeline Pull-In | Troll Alpha, North Sea, Norway
Internal End Cap removed for Seal Cartridge and Temporary Anchor installation in gravity base structure 300m below sea level STATS Group successfully executed a 36” ...
24” Remote Tecno Plug | North Sea, UK
Double block and bleed isolation barrier provides safe tie-in of replacement pipeline section
16" Remote Tecno Plug | K5-A Platform | Case Study
Tecno Plug™ isolates gas export pipeline to facilitate subsea metrology spool piece installation
Mechanical Pipe Connectors, Oil Terminal, Norway
STATS mechanical pipe Connectors provide a cold-work solution, removing the associated risks of welding. Quick and efficient to install, this permanent solution ...
Shutdown Services, North Sea, UK
STATS Group has provided hot-work barriers, localised hydrostatic testing and onsite machining services during a planned shutdown of an offshore platform in the North ...
Optimising Offshore: STATS' Pipe End Plugs for Pressurised Installation
Subsea 7 contracted STATS Group to provide positive isolation of pressurised mechanically lined BuBi® pipe to facilitate reeling onto a pipe lay vessel at their facility ...
2" to 20" In-Line Weld Test Tools | Gulf States
STATS Group has completed hydrostatic testing services on behalf a major Gulf States operator. The workscope involved providing a verified barrier during hot work ...
½” to 18” E-PEPs™ | Kashagan Oilfield, Kazakhstan
Discovered in July 2000 the Kashagan oilfield is one of the most important oil finds in recent times. It is estimated to hold 38 billion barrels of oil, with a potential ...