
STATS Group Delivers Landmark First Hot Tap & BISEP Isolation Project in Indonesia
STATS Group has successfully completed its first ever hot tap and BISEP® isolation project in Indonesia to support PEGASOL on behalf of Pertamina Gas Negara (PGN).
Read the case study

Production Maintained During Challenging Valve Replacement
STATS has successfully completed a challenging hot tap and line stop isolation on a 33bar operating system, allowing for the safe replacement of two 6" Slam Shut valves ...
Read the case study

6” BISEP with Integrated Bypass, Perth, Australia
Hot tapping and plugging on a 6” natural gas pipeline to safely re-route a pipeline to allow construction of a new highway, while production was maintained.
Read the case study