10

10" Bisep, Natural Gas Plant, Australia

STATS Group were recently retained by a major operator in Australia to provide isolation of a pressurised 10” LPG pipeline at a natural gas plant. The isolation was ...
Read the case study
10” Dual BISEPs | Jet Fuel Pipeline, Abu Dhabi, UAE

10” Dual BISEPs | Jet Fuel Pipeline, Abu Dhabi, UAE

STATS Group were contracted by Bilfinger Deutsche Babcock on behalf of the Abu Dhabi Oil Refining Company, Takreer, to provide hot tapping and plugging services to allow ...
Read the case study
10” BISEP | Brent Bravo & Delta Platforms, North Sea, UK

10” BISEP | Brent Bravo & Delta Platforms, North Sea, UK

Innovative, ground breaking and even, on occasion, not possible, just a few of the references to the successfully completed Brent Bravo and Brent Delta Cell Fill Line ...
Read the case study
6” Bisep™ | Theddlethorpe Terminal, Lincolnshire, Uk

6” Bisep™ | Theddlethorpe Terminal, Lincolnshire, Uk

STATS Group, has completed a pipeline isolation project at Theddlethorpe gas terminal in Lincolnshire on behalf of Wood Group PSN and Conoco Phillips. STATS technicians ...
Read the case study
6” BISEP™ | Dammam’s Second Industrial Area, Saudi Arabia

6” BISEP™ | Dammam’s Second Industrial Area, Saudi Arabia

STATS Group performed hot tapping and plugging operations on a live gas pipeline to allow maintenance activities to be carried out safely in the Kingdom of Saudi Arabia.
Read the case study
4

4" BISEP & Tecno Plug, Gas Plant, Abu Dhabi, UAE

STATS Group were required to provide a double block and bleed isolation as an emergency response for a major gas processing plant in Abu Dhabi, UAE. The quick response ...
Read the case study
3.5

3.5" BISEP™ | Murchison Platform, North Sea, UK

STATS Group in collaboration with Paradigm Flow Services and Halliburton safely and successfully isolated, de-oiled, plugged and abandoned two 3.5” subsea flowlines as ...
Read the case study
3” BISEP™ | Piper Bravo Platform, North Sea, UK

3” BISEP™ | Piper Bravo Platform, North Sea, UK

Wood Group on behalf of Talisman Energy UK, required an isolation to be conducted on a 3” Air Line on-board the Piper Bravo. The isolation would facilitate a deconstruct ...
Read the case study
3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK

3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK

TAQA Bratani Ltd required an isolation solution to facilitate pipework replacement of a 3” instrument air line on board the Tern Alpha Platform without the necessity for ...
Read the case study
5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada

5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada

STATS Group has developed a mini-version of its BI-STOP pipeline isolation tool to assist Alberta-based ATCO Gas to complete a meter replacement programme in built-up ...
Read the case study

Contact Us

We offer expertise and cutting-edge technologies to solve your integrity challenges.
Enquire Now

Terms & Conditions

Click on the links below to download a copy of our Terms and Conditions

Purchase Order Terms and Conditions

Terms and Conditions for Sale, Rental, and Services

For further information, please email: sales@statsgroup.com