
3” BISEP™ | Piper Bravo Platform, North Sea, UK
Wood Group on behalf of Talisman Energy UK, required an isolation to be conducted on a 3” Air Line on-board the Piper Bravo. The isolation would facilitate a deconstruct ...
Read the case study

3” BISEP™ & Tecno Plug™ | Tern Alpha Platform, North Sea, UK
TAQA Bratani Ltd required an isolation solution to facilitate pipework replacement of a 3” instrument air line on board the Tern Alpha Platform without the necessity for ...
Read the case study

5/8” BI-STOP™ | Natural Gas Distribution Utility, Alberta, Canada
STATS Group has developed a mini-version of its BI-STOP pipeline isolation tool to assist Alberta-based ATCO Gas to complete a meter replacement programme in built-up ...
Read the case study